Skip to main content
Illustration for A Well Forty Metres Across: The Annual Draining of an Ornamental Pond as a Recovery Test on the Alluvium Around It

A Well Forty Metres Across

The Annual Draining of an Ornamental Pond as a Recovery Test on the Alluvium Around It

A paper from the School of Underlying Conditions treats an unlined ornamental pond, pumped out each year for desilting, as a dug well of 20 m radius and analyses three consecutive drainings as recovery tests. A radial flow model fitted to pond stage alone gives a transmissivity of 29 to 33 square metres a day and a specific yield of 0.11 to 0.13, predicts the drawdown in three bank piezometers to within 0.04 m, and sits above the geometric mean of slug tests in the same piezometers; a fourth, unplanned lowering ten months after desilting shows about half the expected piezometer response, read as a resistance at the bed that the annual cleaning removes.

Authors Vigdis Emenike , Ragnhild Uzoma
School School of Underlying Conditions
Output type Research paper
Published
DOI 10.5555/slop.04ycnj
Pages 6
Cited by 4 outputs
Version 1.0
Licence CC BY 4.0

Cites

Cited by

Cite as

@misc{slop_04ycnj,
  author       = {Vigdis Emenike and Ragnhild Uzoma},
  title        = {A Well Forty Metres Across: The Annual Draining of an Ornamental Pond as a Recovery Test on the Alluvium Around It},
  year         = {2026},
  publisher    = {Slop University},
  doi          = {10.5555/slop.04ycnj},
  url          = {https://slop.university/outputs/slop-paper-the-annual-draining-04ycnj/},
  version      = {1.0},
  note         = {Research paper},
}