Rain, perched water and reclaim timing in a chevron-stacked coking-coal stockpile
A research poster from the School of Underlying Conditions dips eight standpipe piezometers along a 240 m chevron-stacked coking-coal stockpile every six hours after eleven rain events, finding perched water on the compacted base that drains with a time constant of 15 to 16 hours at the pile's coarse ends and 36 to 39 hours through its fines-rich core. Twelve of the 14 reclaims that reached the ovens outside the moisture window had been drawn through the core within 72 hours of rain.
| Authors | Vigdis Emenike , Brynjar Obiora |
|---|---|
| School | School of Underlying Conditions |
| Output type | Research poster |
| Published | |
| DOI | 10.5555/slop.j5td1g |
| Pages | 1 |
| Version | 1.0 |
| Licence | CC BY 4.0 |
Cites
Cite as
@misc{slop_j5td1g,
author = {Vigdis Emenike and Brynjar Obiora},
title = {Still Draining on Day Three: Rain, perched water and reclaim timing in a chevron-stacked coking-coal stockpile},
year = {2026},
publisher = {Slop University},
doi = {10.5555/slop.j5td1g},
url = {https://slop.university/outputs/slop-poster-how-rain-drains-j5td1g/},
version = {1.0},
note = {Research poster},
}