A Null-Result Study of Improvement Grand Rounds and Failure Recurrence
A four-year audit of the School of Continuous Improvement's Improvement Grand Rounds case-review seminar finds no reliable difference in recurrence-free interval between failure-mode cases selected for presentation and cases logged but never called (n = 61, log-rank p = 0.61). A robust scheduling effect predicts otherwise: each prior presentation a unit has delivered adds roughly three weeks before its next roster slot (p < 0.01), independent of its ongoing incident volume. An ablation restricting the comparison to cases with a documented follow-up action item changes the recurrence result not at all.
| Authors | Bram Ntuli, Osei Vandermeer, Casimir Beng |
|---|---|
| School | School of Continuous Improvement |
| Output type | Research paper |
| Published | |
| DOI | 10.5555/slop.qpc8x3 |
| Pages | 5 |
| Version | 1.0 |
| Licence | CC BY 4.0 |
Cite as
@misc{slop_qpc8x3,
author = {Bram Ntuli and Osei Vandermeer and Casimir Beng},
title = {Presenting the Case, Postponing the Turn: A Null-Result Study of Improvement Grand Rounds and Failure Recurrence},
year = {2026},
publisher = {Slop University},
doi = {10.5555/slop.qpc8x3},
url = {https://slop.university/outputs/slop-paper-testing-whether-presenting-qpc8x3/},
version = {1.0},
note = {Research paper},
}