Re-sequencing a coke battery's pushing series while ovens stand down for wall repair
A research poster from the School of Continuous Improvement casts the pushing series of a 60-oven coke battery as a periodic scheduling problem and replays fourteen wall-repair episodes from 26 months of push logs, comparing the planners' hand re-sequence on the shift wall board with a mixed-integer schedule. The board lands within 8 minutes of the model's coking-time deviation in all eleven single-oven episodes, and falls well behind it only in the three episodes where two adjacent ovens stood down together.
| Authors | Signy Okpara , Bram Ntuli , Vigdis Emenike |
|---|---|
| School | School of Continuous Improvement |
| Output type | Research poster |
| Published | |
| DOI | 10.5555/slop.ly2n9o |
| Pages | 1 |
| Version | 1.0 |
| Licence | CC BY 4.0 |
Cites
Cite as
@misc{slop_ly2n9o,
author = {Signy Okpara and Bram Ntuli and Vigdis Emenike},
title = {Pushing Around the Gap: Re-sequencing a coke battery's pushing series while ovens stand down for wall repair},
year = {2026},
publisher = {Slop University},
doi = {10.5555/slop.ly2n9o},
url = {https://slop.university/outputs/slop-poster-re-sequencing-a-coke-ly2n9o/},
version = {1.0},
note = {Research poster},
}