Skip to main content
Illustration for Level Five Is a Bucket: A five-level maturity model for the roadworks Stop/Slow bat, scored at 30 lane closures

Level Five Is a Bucket

A five-level maturity model for the roadworks Stop/Slow bat, scored at 30 lane closures

A research poster from the School of Continuous Improvement scores 30 roadworks lane closures on a five-level Stop/Slow bat maturity model, Held Low to Bucketed, finding that median queue-clear waits fall from 98 s at Level 1 to 41 s at Level 4 and rise to 68 s at the three Level Five closures, and that the road authority stands down the controller at any closure reaching Level Five, leaving the bat in a 20-litre bucket for the rest of the works.

Authors Eivind Onwuka , Marit Osayande , Signy Okpara
School School of Continuous Improvement
Output type Research poster
Published
DOI 10.5555/slop.l4a0zb
Pages 1
Cited by 6 outputs
Version 1.0
Licence CC BY 4.0

Cites

Cited by

Cite as

@misc{slop_l4a0zb,
  author       = {Eivind Onwuka and Marit Osayande and Signy Okpara},
  title        = {Level Five Is a Bucket: A five-level maturity model for the roadworks Stop/Slow bat, scored at 30 lane closures},
  year         = {2026},
  publisher    = {Slop University},
  doi          = {10.5555/slop.l4a0zb},
  url          = {https://slop.university/outputs/slop-poster-a-roadworks-traffic-l4a0zb/},
  version      = {1.0},
  note         = {Research poster},
}