Skip to main content
Illustration for Twenty-Five Minutes Before the First Measurement: Warm-Up Transients in a Slow-Shear Tellurium Dioxide Acousto-Optic Deflector

Twenty-Five Minutes Before the First Measurement

Warm-Up Transients in a Slow-Shear Tellurium Dioxide Acousto-Optic Deflector

A paper from the School of Continuous Improvement logs 78 starts of one acousto-optic deflector for an hour after its drive is switched on, finding that the steered beam settles along two exponentials of 1.9 and 13.4 minutes and needs a median 25 minutes at 1.0 W to come within 5 microradians of its resting position, long after diffraction efficiency has recovered. A two-node thermal model designs a twelve-minute overdrive preheat that cuts the wait to nine minutes, and parking the drive at the band edge between sessions removes it.

Authors Edda Nwafor , Casimir Beng
School School of Continuous Improvement
Output type Research paper
Published
DOI 10.5555/slop.ia16am
Pages 6
Cited by 2 outputs
Version 1.0
Licence CC BY 4.0

Cites

Cited by

Cite as

@misc{slop_ia16am,
  author       = {Edda Nwafor and Casimir Beng},
  title        = {Twenty-Five Minutes Before the First Measurement: Warm-Up Transients in a Slow-Shear Tellurium Dioxide Acousto-Optic Deflector},
  year         = {2026},
  publisher    = {Slop University},
  doi          = {10.5555/slop.ia16am},
  url          = {https://slop.university/outputs/slop-paper-warm-up-transients-in-ia16am/},
  version      = {1.0},
  note         = {Research paper},
}