Sizing a Stand-Alone PV–Battery–Diesel System for a Seasonal Shearing Shed, with the Stock-Water Bore as Deferrable Load
A paper from the School of Continuous Improvement and the School of Underlying Conditions logs one spring at a six-stand shearing shed that draws 72% of its annual energy in six weeks, and sizes PV, battery and diesel configurations against twenty-year net present cost. No design sized for the shed alone undercuts the existing generator; with the property's stock-water bore added as a deferrable load through its header tank, the least-cost design of 8 kWp and 10 kWh is 15% cheaper than diesel and cuts fuel use by 78%.
| Authors | Sten Okwuosa , Vigdis Emenike |
|---|---|
| School | School of Continuous Improvement |
| Output type | Research paper |
| Published | |
| DOI | 10.5555/slop.0kkbm7 |
| Pages | 6 |
| Cited by | 2 outputs |
| Version | 1.0 |
| Licence | CC BY 4.0 |
Cites
Cited by
Cite as
@misc{slop_0kkbm7,
author = {Sten Okwuosa and Vigdis Emenike},
title = {Six Weeks of Load: Sizing a Stand-Alone PV–Battery–Diesel System for a Seasonal Shearing Shed, with the Stock-Water Bore as Deferrable Load},
year = {2026},
publisher = {Slop University},
doi = {10.5555/slop.0kkbm7},
url = {https://slop.university/outputs/slop-paper-six-weeks-of-0kkbm7/},
version = {1.0},
note = {Research paper},
}