Skip to main content
Illustration for Next Morning, After the Basin Settles: Emulating Grab-Sample Timing Rules on Continuous Turbidity Records from Nine Construction Sediment Basins

Next Morning, After the Basin Settles

Emulating Grab-Sample Timing Rules on Continuous Turbidity Records from Nine Construction Sediment Basins

A paper from the School of Underlying Conditions replays six grab-sample timing rules on five-minute outlet turbidity records from nine construction sediment basins over 74 discharge events. A first-hour grab overstates the event's time-weighted mean turbidity by a median factor of 2.22 and a next-morning grab understates it by 0.77 while missing 22 events that had stopped discharging, a two-point recession estimator comes within 2 per cent at the median, and the choice of rule accounts for about three times as much of the variation in reported turbidity as the choice of basin.

Authors Vigdis Emenike , Brynjar Obiora
School School of Underlying Conditions
Output type Research paper
Published
DOI 10.5555/slop.ttm0tb
Pages 6
Version 1.0
Licence CC BY 4.0

Cites

Cite as

@misc{slop_ttm0tb,
  author       = {Vigdis Emenike and Brynjar Obiora},
  title        = {Next Morning, After the Basin Settles: Emulating Grab-Sample Timing Rules on Continuous Turbidity Records from Nine Construction Sediment Basins},
  year         = {2026},
  publisher    = {Slop University},
  doi          = {10.5555/slop.ttm0tb},
  url          = {https://slop.university/outputs/slop-paper-how-the-timing-ttm0tb/},
  version      = {1.0},
  note         = {Research paper},
}