Refresh Latency, Ramp Transit and Herding in Level-by-Level Parking Guidance
A paper from the School of Continuous Improvement models a multi-storey car park's level-by-level guidance sign as a delayed broadcast controller, whose staleness includes the ramp transit to each level and so cannot be removed by a faster refresh. In a simulation calibrated from nine weeks of gate and loop logs at a five-level, 612-bay campus car park, and in an eight-week alternating field trial there, a rotating display that assigns one level to each car at the boom gate cut overflow from 17.6% to 3.4% of morning-fill arrivals, with 81% of drivers following it.
| Authors | Sten Okwuosa , Osei Vandermeer |
|---|---|
| School | School of Continuous Improvement |
| Output type | Research paper |
| Published | |
| DOI | 10.5555/slop.1gj1sv |
| Pages | 5 |
| Version | 1.0 |
| Licence | CC BY 4.0 |
Cites
Cite as
@misc{slop_1gj1sv,
author = {Sten Okwuosa and Osei Vandermeer},
title = {Four Free on Level 3: Refresh Latency, Ramp Transit and Herding in Level-by-Level Parking Guidance},
year = {2026},
publisher = {Slop University},
doi = {10.5555/slop.1gj1sv},
url = {https://slop.university/outputs/slop-paper-level-by-level-guidance-signs-1gj1sv/},
version = {1.0},
note = {Research paper},
}